Materials

Revival Gold Expands Drilling Program at Beartrack-Arnett Following Encouraging Results

Last Updated:
Reading Time
2 min

#Significant Drill Results Prompt Expansion

Revival Gold Inc., a prominent developer in the gold mining sector, has unveiled initial drill results from its Joss area at the Beartrack-Arnett Project in Idaho. The company recorded a notable intercept of 6.4 grams of gold per tonne (g/T) over 19.1 meters at a depth of 573 meters, prompting a strategic extension of the drill program by an additional 4,900 meters utilizing two drilling rigs.

#Key Highlights from the Drilling Campaign

The recently completed Hole BT26-252D, which achieved significant drill width and depth, indicated high-grade gold mineralization. This well-defined mineral zone exhibited:

  • 5.4 g/T gold over 32.6 meters at 568 meters depth.
  • 6.4 g/T gold across 19.1 meters at 573 meters depth.
  • 8.0 g/T gold over 4.3 meters at 596 meters depth.

Additionally, two other boreholes, BT26-251DA and BT26-253D, also confirmed the presence of gold within the project's primary shear zone, although assay results from these holes are still pending.

#Potential for Underground Mining

Revival Gold has noted the impressive vertical dip and the substantial width of the mineralization, which presents a viable opportunity for lower-cost underground mining methods. This prospect underscores the company’s vision of integrating an underground study alongside the current open pit heap leach operations, which could evolve into a three-phase development model.

#Strategic Importance of the Joss Area

The Joss area currently hosts an inferred mineral resource of approximately 877,000 ounces of gold, which has not been factored into the recent preliminary feasibility studies. The ongoing drilling efforts aim to expand these high-grade underground mineral resources, especially given the geological structure that runs along the Panther Creek Shear Zone.

#Conclusion

As the Beartrack-Arnett Project continues to demonstrate significant gold potential, Revival Gold is well-positioned to advance its exploration and development strategies, aiming for an ambitious production target of 300,000 ounces of gold annually.

#Key Takeaways

  • Revival Gold reports an intercept of 6.4 g/T gold over 19.1 meters, encouraging additional drilling at the Beartrack-Arnett Project.
  • The drilling program has been extended to 4,900 meters with two rigs in operation, reflecting the project's potential.
  • The Joss area currently contains an inferred resource of 877,000 ounces of gold.
  • Results support considerations for lower-cost underground mining techniques, enhancing economic viability.
  • Drilling efforts aim to achieve a production target of 300,000 ounces per year.

Original source: Read original article

Frequently Asked Questions

Revival Gold recently announced high-grade intercepts from the Joss area within their Beartrack-Arnett Project, highlighting notable findings such as 6.4 g/T gold over 19.1 metres at 573 metres downhole. This suggests promising potential for further resource expansion.
Following the promising drill results, Revival Gold has extended its drilling programme to 4,900 metres with two rigs currently operating. This proactive approach indicates a strong commitment to further exploration and potential resource enhancement.
The drill results indicate a near vertical dip and true widths of 12-16 metres, suggesting the feasibility of lower-cost underground mining techniques. This presents a favourable outlook for the development of the project.
Currently, the Joss area hosts an inferred mineral resource of approximately 877,000 ounces of gold, which has not been included in recent feasibility studies. This substantial resource base underscores the project’s significant potential.
The step-out drilling conducted in the current programme has successfully extended the mineralised zone over 1.2 km of strike, reinforcing the project's promising outlook for resource expansion and discovery.
Revival Gold aims to move closer to its target of producing 300,000 ounces of gold per year. Expanding underground studies and ongoing drilling form part of a strategic approach to enhance overall project economics.
Revival Gold employs a robust Quality Assurance/Quality Control programme involving certified reference materials and duplicate samples, ensuring the reliability of assay results. This commitment to quality enhances confidence in exploration outcomes.
Revival Gold's ongoing exploration and development activities appear to be strategically aligned with future funding needs, supported by a promising project portfolio that may attract investment as exploration yields positive results.