Boron One Holdings Inc. [TSXV:BONE] has applied for a new three-year exploration licence covering the Piskanja Project area. The proposed licence would replace the company’s existing licence, which expires in January 2027, but the announcement confirms an application rather than the granting of a new licence.
#Purpose of the licence application
Boron One said the application is intended to preserve its exclusive exploration rights at Piskanja while it progresses the exploitation field approval process and assesses opportunities to expand the known mineral resource.
The company’s proposed exploration programme includes drilling outside the current resource area and additional drilling within the central part of the deposit.
#Proposed drilling programme
Step-out drilling is planned to examine extensions to the known mineral resource, particularly because the deposit remains open to the west and south. Earlier holes drilled approximately 200 meters beyond the existing resource boundaries in those directions intersected borate mineralization described by the company as having potentially economic thickness and grade.
The proposed work would assess the continuity and extent of that mineralization and its potential relevance to future mineral resource expansion. Boron One also plans infill drilling in the central portion of the deposit to support possible conversion of existing Mineral Resources to the Measured category.
The infill programme would also examine whether lower-grade mineralized intervals could be included in future Mineral Resource estimates. These activities remain proposed plans and are subject to the relevant assumptions, approvals, permits, financing and personnel availability identified by the company.
#Piskanja resource information
Boron One reports that the Piskanja Boron Project contains a Measured Mineral Resource of 1.05 million tonnes averaging 34.78% B2O3 and an Indicated Mineral Resource of 6.09 million tonnes averaging 31.99% B2O3.
The figures were calculated under the Canadian Institute of Mining Definition Standards on Mineral Resources and Reserves. They were disclosed in the company’s technical report and preliminary economic assessment for the Piskanja Borate Project, Serbia, dated October 12, 2026. Prof. Miodrag Banješević PhD. P.Geo, EurGeol, is identified as the responsible person for the preliminary economic assessment and Mineral Resource Estimate and as independent of Boron One.
#Risks and forward-looking information
Boron One said statements concerning infill drilling, potential resource reclassification, possible inclusion of lower-grade intervals, and the timing, scope and objectives of future exploration and development are forward-looking statements.
The company’s assumptions include the continuity of mineralization, the accuracy of geological interpretations, and the availability of financing, permits and personnel. Boron One also identified risks linked to exploration and drilling results, changes in Mineral Resource estimates, regulatory approvals, permitting, commodity-price fluctuations, operating and technical challenges, financing, and general economic, market and business conditions. The company cautioned that actual results may differ materially from those expressed or implied by the forward-looking statements.
#About Boron One
Boron One Holdings Inc. is focused on the responsible development of its boron assets and says boron is used in agriculture, energy storage, fiberglass, ceramics, detergents and advanced materials. The company is headquartered in Victoria, B.C., Canada, and its shares trade on the TSX Venture Exchange under the symbol “BONE”.
#Key Takeaways
- Boron One has applied for a new three-year exploration licence covering the Piskanja Project area.
- The proposed licence is intended to replace the existing licence, which expires in January 2027.
- Planned work includes step-out drilling west and south of the current resource boundaries and infill drilling in the deposit’s central area.
- The reported Piskanja resource includes a Measured Mineral Resource of 1.05 million tonnes averaging 34.78% B2O3 and an Indicated Mineral Resource of 6.09 million tonnes averaging 31.99% B2O3.
- Boron One said its exploration and resource-related plans are subject to forward-looking risks and uncertainties, including permitting, financing, drilling results and regulatory approvals.
Original source: Read original article