Back to all Canterra Minerals Corporation press releases
Canterra Minerals Corporation
- FSE:DXZB
- OTCQB:CTMCF
- TSXV:CTM
Canterra Reports Buchans Drill Results, Including 4.34% CuEq Interval at Two Level
Published
FAQSIR Generated from this announcement View original release below for safe harbor and regulatory notices
Announcement Summary
Canterra Minerals Corporation (TSXV:CTM) (OTCQB: CTMCF) (FSE:DXZB) reported assay results from its winter drill program at the Buchans Project.
- The program comprised eight holes totaling 2,386 meters, completed between February and March 2026, at the Buchans Project.
- Hole H-26-3563 intersected 1.65 meters of 4.34% CuEq at Two Level and was interpreted as a semi-massive to massive sulfide lens.
- Hole H-26-3561 returned 57.15 meters of 0.57% CuEq, including 11 meters of 1.32% CuEq, in northeastern Lundberg mineralization.
- The company said Hole H-26-3562 supported lateral continuity after intersecting 3.05 meters of 2.14% CuEq approximately 250 meters south.
- Holes H-26-3559 and H-26-3560 returned 44.5 meters of 0.34% CuEq and 51 meters of 0.17% CuEq, including stated subintervals.
- At West Clementine, two holes totaling over 1,300 meters tested anomalies; two were explained by weakly altered, mineralized rocks and a fault, while a third remains untested.
Drilling stopped short of the third target because of sudden early spring thaw; casing was left for completion under winter 2027 conditions. The company said Phase 2 drilling was about to begin.
Investor FAQs
Read the original press release
Full text as published, unedited.